-
Block and head are baked clean. This system provides a block that is as
clean on the inside as the out. In addition this process stress relieves the
castings.
-
Crankshafts are NEW (except 6416/6068).
-
Camshafts and lifters are reground.
-
Balancer shafts are NEW. New balancer bushings are installed.
-
Connecting rods are rebuilt with new wrist pin bushings and rod bolts.
-
Head is rebuilt with NEW valves, springs, seals and keepers. Head deck is
milled and the valve seats are precision cut to absolute factory spec.
-
Rocker arm assemblies are rebuilt and installed.
-
Front gear train is installed and timed.
-
All gaskets needed to complete engine to running configuration, are provided.