Block and head are baked clean. This system provides a block that is as
clean on the inside as the out. In addition this process stress relieves the
castings.
Crankshafts are usually NEW. If new is not available turned crankshafts are
installed
Camshafts and lifters are reground.
Connecting rods are new or rebuilt with new wrist pin bushings and rod bolts.
Front gear train is installed and timed.
All gaskets needed to complete engine to running configuration, are provided.